Business Type

the building safety management system according to the building control act, section 32 bis, to apply for a building inspection certificate r.1 by a professional building inspector. association of building inspectors professional license of professional engineer ordinary engineer-associate engineer level

installation 1. adjust the roof level of the building where the floor slab will be placed so that it is smooth and level. before laying the floor, the beams that will be supported should be cleaned. keep the weight of the floor free of soil or plaster fragments. in order to place the floor closely

high cool reflector, metallic heat reflector, sapphire reflector tile installation equipment black screw, screw shot screw, smart screw shot screw anchor nail strike, wooden nail nail, wooden nail, nail fixing tile dc designs gypsum plaster wire hanger, lock clips, black level adjustable ceiling

our services include: asset and personnel protection: we prioritize the safety of your assets and employees, providing high-level security to ensure peace of mind for your business operations.

resistant fabric gasket, width 1 meter cloth gasket, tape width 1-4 inches, cloth gasket, fiberglass tape felt, glass fiber, red fiber, paper, leather waterproof rubber gasket, oil proof, white rubber silicone distributor of boiler industry equipments and spare parts glass tube level

our teachers adapt methods to each child’s interests and needs, ensuring personalized, effective instruction at every level. parents are welcome to join the classroom for 10 minutes after class to understand the teaching approach, support homework, and engage with the teacher’s methods.

our commitment to your security: we are dedicated to providing our clients with the highest level of security services. our team of experienced professionals is committed to safeguarding your assets and ensuring the safety of your premises and personnel.

preventive maintenance electric transformer check the transformer oil level. leakage of gaskets, rubber seals, transformer drain valves and all bushings check the condition of the transformer tank - cooling fins. check the moisture filter.

auto level),(theodolite), total station, gps, (prism), (pole),(tripod),

such as ​ ceiling installation accessories, manufacture and sale of ceiling frame materials ceiling installation materials hanging ceiling t-bar hang a smooth ceiling. clevis hanger (adjustable clevis hanger), clip lock, 2-hole bracket, steel angle, tee cross, tee main, rod joiner, adjustable spring level