Business Type

other additional services, demolishing buildings, demolishing concrete bridges demolish buildings demolish the old factory - the old abandoned building clear wasteland contractor to dig the soil line for laying water pipes, laying gas pipes, laying drainage pipes. digging the soil to bury a septic tank

fittings Plumbing equipment Fiber water tank, water tank, underground tank, stainless steel water tank, diamond brand roof tile Roof Tile Distributor Corrugated roof tile, side cover, upper corner adjustment cover Male side cover, galvanized cover, large corrugated zinc Small corrugated zinc, large

imported from Europe Stone-Lime-Sand-Water Scale with Load cell system and concrete conveyor system Wire puller and wire frame arc welding machine Spot welding machine for prestressed concrete pipes TAITONG cement silo tank factory and concrete mixer set.